Construction & engineering

Existing-condition surfaces, CAD geometry and source-derived site context for construction and engineering teams.

OPERATIONAL PRIORITY

Build a clear data foundation before design and site coordination depend on it.

CAD that follows your templateDocumented source dates and gapsSurfaces ready for client review
COMMON CAPACITY NEEDS

Where Altivue Geospatial plugs in.

01

Existing-condition mapping

Translate suitable point clouds and imagery into site plans, feature lines and source-referenced CAD geometry.

02

Surface preparation

Prepare terrain and surface models with agreed breaklines, exclusions and coordinate references.

03

Reality-capture preparation

Clean and organize registered scans or photogrammetric clouds for the target software and project extent.

04

Drawing and model handoff

Check layers, units, elevations and representative imports with the designer before scaling production.

THE MANAGER'S REVIEW

Confirm the model fits the designer's intended use.

Bring source survey or scan dates, registration status, project limits, coordinate references, required surface objects and the working CAD version and template.

  • Inspect a pilot with the designer for units, layers and native object behavior
  • Review terrain exclusions, breaklines and gaps against the source
  • Identify features and areas that need field verification before design decisions
RESPONSIBILITY BOUNDARYProduction geometry supports client review. It does not replace a certified survey, engineering design, subsurface investigation or contractual verification of construction quantities.BEFORE SENDING DATAConfirm authorized access, transfer method, permitted processing locations and retention requirements with the project contact. Begin with a non-sensitive sample where possible.
ADD CAPACITY DELIBERATELY

Test one real workflow.

Use a representative dataset and your own standard to measure the fit.

Start a pilot ↗︎