Survey & aerial mapping

Flexible production capacity for firms whose acquisition volume moves faster than internal processing capacity.

OPERATIONAL PRIORITY

Convert variable capture volume into predictable, reviewable delivery capacity.

Protect internal project schedulesKeep specifications and templates intactReduce senior review effort
COMMON CAPACITY NEEDS

Where Altivue Geospatial plugs in.

01

Seasonal production overflow

Add calibrated capacity for peak acquisition periods without changing the client-facing standard.

02

Classification and terrain products

Move LAS/LAZ through cleanup, classification, surfaces and tile-level checks using one controlled specification.

03

Point cloud to CAD

Deliver base mapping, breaklines, surfaces and profiles in the firm’s own CAD environment.

04

Independent project QA

Use a separate technical pass to identify systematic errors, omissions and delivery inconsistencies.

THE MANAGER'S REVIEW

Keep your acquisition and acceptance responsibilities explicit.

Bring the acquisition report, coordinate and vertical reference, target specification, representative tiles and the delivery schedule your project manager needs to protect.

  • Pilot terrain and land-cover edge cases, not just an easy tile
  • Separate source accuracy evidence from classification and surface QA
  • Agree batch review dates, issue ownership and correction turnaround before scaling
RESPONSIBILITY BOUNDARYYour survey lead retains responsibility for control, survey interpretation and professional sign-off. Confirm any independent review requirement and who can perform it before commissioning the work.BEFORE SENDING DATAConfirm authorized access, transfer method, permitted processing locations and retention requirements with the project contact. Begin with a non-sensitive sample where possible.
ADD CAPACITY DELIBERATELY

Test one real workflow.

Use a representative dataset and your own standard to measure the fit.

Start a pilot ↗︎